精品成人免费自拍视频|一本大道看香蕉大在线|五月丁香乱码日韩精品区|久久国产精品成人片免费|日韩中文字幕亚洲精品欧美|视频福利国产午夜一区二区|国产毛片一区二区三区精品|国产欧美精品一区二区三区网址

<rt id="vbn1q"><label id="vbn1q"></label></rt>

  • <rt id="vbn1q"><dfn id="vbn1q"></dfn></rt>

      1. 
        

        <form id="vbn1q"></form>
        The Annual Equipment of Pipeline and Oil &Gas Storage and Transportation Event
        logo

        The 26thBeijing International Exhibition on Equipment of Pipeline and Oil & Gas Storage and Transportation

        ufi

        BEIJING, China

        March 26-28,2026

        LOCATION :Home> News> Industry News

        Saudi Aramco selects AUMA for Al Wasit Gas contract

        Pubdate:2015-11-18 08:50 Source:mcc Click:
        MUELLHEIM, Germany -- Approved Saudi Aramco vendor status, strong technical support and strength in after-sales service were key reasons for the selection of AUMA valve control devices at the Al Wasit Gas Program, Saudi Aramco’s development scheme for the Arabiyah and Hasbah offshore Saudi Arabian gas fields located in the Arabian Gulf. The significant oil and gas contract for AUMA included an order for more than 400 electric actuators and gear boxes.
         
        Reporting to contractor Saipem, who was awarded the Engineering, Procurement, Installation, Commissioning (EPIC) contract for the project, AUMA’s Middle East organization provided latest actuation technology for several offshore platforms at the scheme. Dedicated and highly qualified AUMA staff worked on the platforms for a two month period to oversee the installation and commissioning of the company’s devices.
         
        Advanced corrosion protection due to AUMA’s powder coating capabilities was an additional reason for the selection of the company’s electric actuation technology. Fulfilling the requirements of the highest corrosivity category C5-I or C5-Mm, specified in EN ISO 12944-2, the company’s robust devices are proven in performance in challenging, high saline coastal and offshore installations.
         
        The full scope of the development of the Arabiyah and Hasbah fields includes gas production, transportation and distribution. The scheme encompasses the installation of a total of 15 platforms, including 12 wellhead platforms, two tie-in platforms and one injection platform. The $4.7 billion project is estimated to increase Saudi Arabia’s gas production by 21%.
        永宁县| 信阳市| 亳州市| 弋阳县| 辽宁省| 霍邱县| 个旧市| 南乐县| 类乌齐县| 即墨市| 郴州市| 原阳县| 富阳市| 安义县| 白沙| 石屏县| 勃利县| 长武县| 新河县| 汾阳市| 昌黎县| 临邑县| 措勤县| 安泽县| 武平县| 淳安县| 湖北省| 南充市| 富蕴县| 哈巴河县| 锡林浩特市| 象山县| 巍山| 武安市| 醴陵市| 杭州市| 泰和县| 山丹县| 城固县| 麟游县| 宁河县|