精品成人免费自拍视频|一本大道看香蕉大在线|五月丁香乱码日韩精品区|久久国产精品成人片免费|日韩中文字幕亚洲精品欧美|视频福利国产午夜一区二区|国产毛片一区二区三区精品|国产欧美精品一区二区三区网址

<rt id="vbn1q"><label id="vbn1q"></label></rt>

  • <rt id="vbn1q"><dfn id="vbn1q"></dfn></rt>

      1. 
        

        <form id="vbn1q"></form>
        The Annual Equipment of Pipeline and Oil &Gas Storage and Transportation Event
        logo

        The 26thBeijing International Exhibition on Equipment of Pipeline and Oil & Gas Storage and Transportation

        ufi

        BEIJING, China

        March 26-28,2026

        LOCATION :Home> News> Industry News

        Kazakhstan plans to launch Line C of gas pipeline to China in Oct

        Pubdate:2014-02-27 10:44 Source:fengyang Click:

        Astana plans to launch the so-called C line of the Kazakhstan-China pipeline with an initial capacity of up to 5 billion cubic meters/year in October, Sauat Mynbayev, chairman of Kazakhstan's national oil and gas producer KazMunaiGaz, said late Tuesday.

        "In October 2014, we plan to launch the C line of the Kazakhstan-China trunk gas pipeline with an [initial] capacity of up to 5 Bcm/year," he said as quoted on the website of the country's Prime Minister.

        China's CNPC had previously said it expected construction of the line to be completed by the end of 2013.

        The line's capacity is set to reach the planned 25 Bcm/year by the fourth quarter of 2014, with 5 Bcm/year of the capacity belonging to the Kazakh side, Mynbayev said, reiterating earlier statements by Kazakh officials.

        The Kazakhstan-China route is part of the Central Asia-China gas pipeline network, which starts in Turkmenistan and cuts through Uzbekistan and Kazakhstan before ending in China's western Xinjiang province.

        The C line will run parallel to the existing A and B lines of the Central Asia-China route, which are already in operation and have a total capacity of 30 Bcm/year.

        Kazakhstan also plans to launch the Beyneu-Bozoy section of the domestic gas network sometime this year, Mynbayev said, earlier than the previously expected 2015 launch.

        Beyneu-Bozoy, which is part of stage two of the Kazakhstan-China gas project, will continue the 6 Bcm/year Bozoy-Shymkent line launched last September. Construction of an additional pumping station is expected to bring total capacity on the Beyneu-Bozoy-Shymkent route to 10 Bcm/year.

        The Bozoy-Shymkent line links up to the Central Asia-China gas route in Kazakhstan's south.

        The capacity of the Beyneu-Bozoy-Shymkent route could be increased to 15 Bcm/year, according to national gas pipeline operator KazTransGaz.

        麻江县| 蒙城县| 滁州市| 成武县| 灵丘县| 泰和县| 曲麻莱县| 桐柏县| 木兰县| 沾化县| 台东县| 夏河县| 房山区| 遂昌县| 高清| 简阳市| 民和| 美姑县| 辉南县| 磴口县| 余姚市| 福海县| 赫章县| 宁强县| 赞皇县| 肇州县| 禹城市| 柘城县| 吉安县| 霍林郭勒市| 罗定市| 吉木乃县| 喀什市| 松原市| 阳原县| 都兰县| 郁南县| 大石桥市| 甘洛县| 应城市| 三门峡市|